The Humboldt County Civil Grand Jury has released a report warning that the Arcata Fire District is “approaching desperate financial conditions” and may have to reduce services and close one of its stations. The report also delves into the District’s lack of a ladder truck and proper staffing to respond to fires in multi-story buildings.
The Arcata Fire District will need a large increase in funding to provide fire and safety services to Arcata's new tall buildings. It is my expressed opinion -- not based on any conversations or any outside input; just based my own speculation -- that the State of California will come up with the money, both the up-front funds and the annual expenses. I say this for a very simple reason: That something has to be done, and the local taxpayers will be completely unwilling to take on theses costs.
This is a 14 minute section of the one-hour presentation by Ben Noble, from June 29, 2022. This section includes Ben's description of of the Ministerial Review permitting process. A link to the full presentation is included.
This is a 14 minute section of the one-hour presentation by Ben Noble, from June 29, 2022. This section includes Ben's description of of the Ministerial Review permitting process. A link to the full presentation is included.
Key to the success of Arcata’s Gateway Area Plan is the quick and certain approval of all projects that meet the standards of the Gateway Code. The current draft has new Gateway buildings up to 37 feet tall – that’s three-stories, generally – being seen only by the Zoning Administrator. This one person would have complete authority to approve new projects. There would be no public hearings for these approvals.
Ministerial Review in the Gateway Area Plan
Ministerial Review is a key ingredient of the Gateway Area Plan. Ministerial Review can include the review and...
Around 2021, Mark Pahuta put up a video of Super-8 film he shot while in Arcata. The film is dated as being from 1968, but more likely it's from around 1976-1977. FILM and STILL IMAGES of Arcata from that era.
Merritt Perry has been the city manager in Fortuna for more than years. Prior to that he worked as City Engineer and director of Public Works in Fortuna for four years. He became interim City Manager following the resignation (after a second DUI) of former Fortuna city manager and Arcata city councilmember and 3-time mayor Mark Wheetley.
Three videos of the fire from June 19, 2024, in Miami. "I did get a chance to speak to one gentleman who tells me he was actually sleeping at the time. He awoke not because he smelled the smoke, not because he heard the commotion, but because he heard a firefighter knocking at his front door. That's what prompted him to get up, get outside."
The traffic crossings are not safe. IT WILL ONLY TAKE ONE FATALITY to have us wishing that we'd thought about this more and done things differently. WITH PHOTOS of 3D images, models, and flashing beacon lights.
Video and Transcriptions on the Sunset-101 Roundabout discussion. From the City Council meeting, February 21, 2024. "If you can make those changes -- the full separated bike and pedestrian facilities, the additional traffic calming measures, and getting rid of the slip lanes."
The letter that sent to the City Council, to request that the Sunset-101 Interchange funding be removed from the Consent Calendar, so that it can be further discussed. From the letter: "I believe there are unsafe elements to this design -- and that the design can be improved to make it safer for bicyclists and pedestrians. The design is good for vehicle traffic flow -- but not so good for bikes and walkers. My strong concern is that with this design there will be vehicle - bicyclist collisions. *** My concern is that someone will get hurt.***
Keeping track of the latest General Plan, Gateway Area Plan, Gateway Zoning Code is not a simple matter. There have been three different versions of a General Plan document -- within one week. And this has happened twice. This article shows how these document-handling procedures are inadequate and poor, and differ from what is done by professionals in every field, all over the world. A solution is proposed.
The fourth draft of the "Draft Gateway Area Plan" from December 2023. In chapters for easy viewing. Also includes the July 11, 2023, 3rd draft, the 2nd draft from October 2022, and the 1st draft, from December 2021.
The letter below was sent on November 28, 2023 to the members of the City Council, the Planning Commission, and the Community Development Director. It outlines some (not all) of the larger issues regarding the expansion of housing that have not been adequately brought up for discussion or resolution. Estimate reading time 6 minutes.
The first Gateway City Council / Planning Commission Joint Study Session took place on August 23, 2023. At this meeting, the three-person sitting Council unanimously affirmed that there will be no new road on L Street. The concept of a couplet with K Street and L Street is to be eliminated from the draft Gateway Area Plan. There is plenty to write about as take-aways from this meeting. Much good was said, and many misconstrued or false notions expressed also. All that will be in a separate article.
As a preview to the August 22, 2023, joint City Council / Planning Commission study session, the City Council says a big NO*NO*NO to the L Street Couplet, and a Yes to the Woonerf and full-width Linear Park. PLUS - thoughts on Inclusionary Zoning and BUILDING HEIGHTS in the Gateway area.
Solar shading, building massing, and the "feel" on the street are easily and quickly seen in a 3D image. Without the 3D image, every design aspect becomes theoretical. With 3D images, the proposed buildings become more real. Despite this, the city planners have provided practically no 3D images.
This article appeared in the Lost Coast Outpost on January 29, 2022. Written by Stephanie McGeary. At that time, the Gateway Plan was proposed to be sent to the City Council by April 2022 -- 1-1/2 years ago.
The "Other Considerations" table supposedly consists of a list of recommendations for changes to the draft Gateway Plan that were in conflict with the draft. The first table came out four months after the 2nd Gateway draft arrived, and contains only a small fraction of the comments from the City's Committees, from the public, and even from the Planning Commissioners that "do not comport" with the official viewpoints.
This is the introduction to the lengthy article on the Urban Field Studio "Code Site Test. PLEASE READ THE FULL ARTICLE ALSO. It will take about 30-45 minutes to read. The full article has both critique and support by an expert of the Gateway Plan, and a good Q&A from Arcata's Planning Commissioners.
The following is a letter sent by Fred Weis to the City Councilmembers. According to the Planning Commission's absurdly accelerated schedule, they are expected to deliver recommendations of a draft of the Form-Based Code, a draft of the Gateway Plan, and a draft of the General Plan following their meeting on July 11th. It is expected that these drafts will be rough and incomplete. With all the work that the Planning Commission has to do, you'd think they'd be working overtime, right? Nope. Their meetings have been shorter than ever.
"By his reckoning, only 8.5% of projects meet their initial estimates on cost and time, and a piddling 0.5% achieve what they set out to do on cost, time and benefits." -- "Over-optimistic time and cost estimates stem from both psychological and political biases: a reliance on intuition rather than data, and . . . “strategic misrepresentation”. This is when budgets are deliberately lowballed in order to get things going, on the premise that nothing would ever get built if politicians went around being accurate."
Now at eighteen months from the introduction of the Draft Gateway Area Plan, the wonderful world that was promised by the plan seems ever more unlikely. I refer to that wonderful world of “thousands of housing units that are environmentally sustainable and affordable to people in all income ranges” and “a broad range of housing densities and types, including rental and owner‐occupied options” that is promised on the opening page of the Draft Plan and continued in that theme throughout the document. *** Let’s look at what’s been ignored over these past eighteen months.
Here's what they said on parking: "Must ensure that sufficient parking provided for both residents and visitors to and employees of local businesses, given rural nature of area and to ensure that parking doesn’t infringe on nearby/local residential neighborhoods. Don’t presume that students, staff, or residents won’t have cars needing to be parked somewhere. 80% of current students are non-local. " ****
Here's what ended up in the General Plan recommendations: "Ensure adequate parking for local businesses and employees."
During the transition from discussion to final document, it seems that many issues raised by the Economic Development Committee are not included in the final document. Among what is absent was their stance on adequate parking for business and residential purposes. Also: "Don't presume that students, staff, or residents won't have cars needing to be parked somewhere. 80% of current students are non-local."
UPDATED WITH DRAFTS and the August 2, 2022 video ---- The Economic Development Committee's Recommendations for the General Plan update. From their August 2, 2022 meeting.
At their March 1 and April 5, 2023, meetings, the Arcata City Council formally directed the Planning Commission to do as much as it can -- as fast as it can -- to create complete and workable drafts of Arcata's new General Plan update, the new Gateway Area Plan, and the brand-new first-time-ever Form-Based Code for the Gateway area. The Council has requested complete working drafts of these three documents by the end of June, 2023 -- now (at the time of this writing) under 3 months away. ----
As the former Community Development Department long-time employee often said: "ANXIETY ON YOUR PART DOES NOT CONSTITUTE AN EMERGENCY ON MY PART."
Do you want your neighborhood rezoned as Residential High Density? **** Come to the City Council meeting on Wednesday, April 5th, and tell our City Councilmembers what you want and do not want for Arcata. The citizens of Arcata have not been informed. **** If you care about your neighborhood, please come and speak. ****
Based on what we've seen, our Community Development Department has an aversion to providing Executive Summaries and actually presenting fact-based conclusions for Arcata's decision-makers. Staff also seems to have an aversion to completing or finalizing ANYTHING. Both the "Strategic Infill Redevelopment Program: Community Engagement Report (Draft)" -- submitted to the public on June 17, 2022 -- and the "City of Arcata Sea Level Rise Risk Assessment" report from April, 2018, are MISSING entirely their Executive Summaries -- even though those summaries are promoted as being part of the documents.
The Draft Gateway Plan pretends that there will be an increase in on-street parking in the Gateway area. In actuality, there will be 50% or so of current parking spaces. In some blocks, there will be less than 25% of what is there now.
Arcata resident, retired professional engineer, and former Greenway Partners partner Steve Salzman asked some basic questions in March, 2022. What happened to the public input element of Planwest's Scope of Work? Why are we working on an Area Plan before updating the General Plan?
How much additional wastewater treatment capacity will be required, how much will it cost and how will it be paid for? Sea Level Rise: Update the Local Coastal Plan based on the most recent and relevant scientific studies and planning efforts.
A full transcription of the 1 hour introductory video presentation of the draft Gateway plan. With comments and opinions about misrepresentations and false information in the video.
WITH VIDEO -- A full transcription of the 1 hour introductory video presentation of the draft Gateway plan. With comments and opinions about misrepresentations and false information in the video.
Which words are repeated hundreds of times in the draft Gateway plan? And which words are conspicuous by their absence? Hint: You won't find the word "sun" or "sunshine" there. Or "solar shade" or "solar shadow" either.
There are over 28,000 words in this document. "House" and "Home" do not appear even once.
The Gateway Area Plan, the General Plan, the Environmental Impact Report, Local Coastal Plan... and articles about these documents.
There are many documents and videos...