For two years we have been waiting for 3D images of what a build-out might look like for the design of the Gateway Area Plan. Finally, here in February 2024, we have some 3D images of what multiple buildings in the Gateway area might look like.
The new General Plan 2045 draft Environmental Impact Report contains an image of an "illustrative plan" that shows a possible build-out design for the Gateway Barrel District. We've been waiting two years for what a potential build-out might look like. This image, plus the new images from Version 3 of the Gateway Code, have finally given us a clue.
A series of 3D images that show the potential construction of four buildings in the Gateway Area. Rare views of a partial look of potential 7-story buildings. ******** MUST SEE ********
Three 35-second videos - QUICK to watch. Plus descriptions, images, and commentary on Solar Shading situation. Arcata's northern latitude makes for a low angle of sun in the Winter months. Any building will make a shadow in the space next to it. The taller the building, the longer the shadow. *** In terms of determining what the solar shading caused by taller buildings on specific sites, unless we have some kind of images of the extent of the solar shading we are "flying blind."
Solar shading, building massing, and the "feel" on the street are easily and quickly seen in a 3D image. Without the 3D image, every design aspect becomes theoretical. With 3D images, the proposed buildings become more real. Despite this, the city planners have provided practically no 3D images.
This image was presented as a one-page handout at the June 13, 2023, Planning Commission meeting. It is a still image from the video presentation “Building and Massing” of the St. Vinnie's site on K Street.
What do we want our buildings to look like? Do we want a boxy building with 5-story walls that go straight up and completely shade the adjoining houses? It is all decided by the Form-Based Code. **** A very brief article with IMAGES that show our choices.
During the past more than one-and-a-half years of discussion on the draft Gateway Plan, we've seen a variety of important aspects of the plan come and go. Critical issues seemed to have arrived as firm promises and later vanished like smoke following a Planning Commission conversation of just a minute or two. Or vanished with no conversation whatsoever. *** An area that's near and dear to the hearts of Arcatans are building heights and the set-back and step-back requirements for new buildings.
Original article: June 16, 2022 --We've been promised the 3D modeling for at least four or five months now. *** ONE AND A HALF YEARS NOW **** Why is 3D Modeling so important? Look at the pictures here and decide for yourself.
The Building & Massing Presentation that arrived on August 12 provides so much needed information, along with the first glimpses of the long-awaited 3D modeling.
3D images and Aerial Views combined with 3D images. Get a visual representation of development in the Gateway area. Includes an imaginary proposal by local architect Julian Berg for the car-wash site.