Related articles:
An annotated Table of Contents for the Draft Environmental Impact Report
The General Plan Draft Environmental Impact Report is here — 1,990 pages
The Gish Gallop — and Brandolini’s Law
Included here is the full original Draft Environmental Impact Report (EIR) document — 1,990-pages. Sections of that 1,990 page document were created from that large document, in smaller, more readable forms.
All these documents can be downloaded or printed if you want. The icons are at the upper right corner of the PDF readers.
The images can be expanded or reduced using the + and – buttons on the PDF viewer.
For the extended annotated Table of Contents, press or click here.
The new table of contents will open up in a separate window.
Contents:
|
||
The page numbers shown are from the original PDF file. | Pages: | |
The original Contents pages | 3 – 4 | |
1. | The full 1,990-page draft Environmental Impact Report document | 1 – 1,990 |
2. | The main portion of the document — 591 pages | 1 – 591 |
3. | Appendix A: Notice of Preparation | 593 – 602 |
4. | Appendix B: Notice of Preparation Comments | 603 – 650 |
5. | Appendix C: California Emissions Estimator | 651 – 740 |
6. | Appendix D: Historical Resources | 741 – 760 |
7. | Appendix E: Environmental Database | 761 – 1,934 |
8. | Appendix F: Noise | 1,935 – 1956 |
9. | Appendix G: Vehicle Miles Travelled | 1957 – 1,990 |
10. | Notice of Availability. January 19, 2024 Notice of Availability, Revised. January 25, 2024 |
|
The original Contents pages
The full 1,990 page document
Suggestions for viewing the full document:
Click on the display option icon at the upper left corner, and select the Contents (or the Thumbnails if that’s what you like.
- Adjust the width of the display by grabbing and sliding the divider.
- Adjust the size to Automatic zoom, page width, page fit, or 100% — whatever works for you on your display.
- Search: Want to search for something? Use the Search button. Or Control-F or Cmd-F on your browser.
- You can go directly to a Page by typing that number in the page number box and pressing Enter.
- Print a single page or range of pages. Or Download the document.
The full 1,990 page document
The main portion of the document
Appendix A: Notice of Preparation
Appendix B: Notice of Preparation Comments
Appendix C: California Emissions Estimator
Appendix D: Historical Resources
Appendix E: Environmental Database
Appendix F: Noise
Appendix G: Vehicle Miles Travelled
The first “Notice of Availability” contained a typographical error on the date when this EIR was expected to be adopted.
The PDF for the first “Notice of Availability” document has a document date of 1/19/24, 11:22:04 AM. It states: “The Arcata General Plan 2045 is anticipated to be adopted in late 2022.
Six days later, in a document dated 1/25/24, 9:17:22 AM, the “revised” version emerged, with the corrected information:
The Arcata General Plan 2045 is anticipated to be adopted in late 2022 early 2024.
The error in itself is small. But it unfortunately is a further example of the general sloppiness we’ve seen in important figures over these past two years.
Notice of Availability – Original and Revised