Arcata1.com on your desktop for a bigger view. Learn more about our city.

No menu items!


CATEGORY

EIR

Gateway Plan and General Plan Updates – Newsletter – May 27, 2024

THIS NEWSLATTER WAS SENT OUT ON MONDAY, MAY 27, 2024. The two scheduled public hearings with the Arcata City Council take place on Wednesdays -- May 29 and June 5, 2024. If needed, the public hearing meetings will be continued. The City Council will consider, take public comment on, discuss, and perhaps vote to adopt the Gateway Area Plan, the Gateway Zoning Code, the Arcata General Plan 2045, and the Final Environmental Report.

The Gateway Code – Specific Issues

A guide to separate articles about specific issues in the Gateway Code.

Caltrans: Comments on the the draft EIR

There are many, many errors and omissions in the draft EIR for the General Plan update, as it was submitted. Here are the comments as submitted by Caltrans.

Comments on the draft EIR from Fred Weis — What was submitted

Here's the 88-page document of comments on the draft Environmental Impact Report that was compiled and sent in by Fred Weis. With summary notes and a linked table of contents for easy viewing and to find what is of interest to you.

3D images from the Gateway Code — and no Linear Park !

For two years we have been waiting for 3D images of what a build-out might look like for the design of the Gateway Area Plan. Finally, here in February 2024, we have some 3D images of what multiple buildings in the Gateway area might look like.

An annotated Table of Contents for the Draft Environmental Impact Report

Here is an extended and annotated Table of Contents for the 1,990 page Draft Environmental Impact Report. The Contents that came with this 1,990 page report consisted of 32 lines. This annotated contents has over 600 entries, to enable the reader to scan and find items within this document.

The Gateway Barrel District “Illustrative Plan” of 1,500 apartment units

The new General Plan 2045 draft Environmental Impact Report contains an image of an "illustrative plan" that shows a possible build-out design for the Gateway Barrel District. We've been waiting two years for what a potential build-out might look like. This image, plus the new images from Version 3 of the Gateway Code, have finally given us a clue.

The 3D images in the draft Environmental Impact Report

A series of 3D images that show the potential construction of four buildings in the Gateway Area. Rare views of a partial look of potential 7-story buildings. ******** MUST SEE ********

The Documents of the General Plan Draft Environmental Impact Report

The General Plan 2045 draft Environmental Impact Report was released to the public on January 29, 2024. These are the sections of the full document, in smaller PDF files for easier reading and downloading.

The General Plan Draft Environmental Impact Report is here — 1,990 pages

The General Plan 2045 draft Environmental Impact Report was released to the public on January 29, 2024. The public comment period runs until March 18, 2024, 5 p.m. At 1,990 pages, this draft EIR is another example of the Gish Gallop -- lots of information, but not easy to find what is pertinent.

Gateway, General Plan, and other City Documents

The Gateway Area Plan, the General Plan, the Environmental Impact Report, Local Coastal Plan... and articles about these documents. There are many documents and videos...