Jim Becker – February 10, 2023

    0
    449

    Loading

     
     

     

    Note:  What is shown below is a copy of the original letter, made for this website.  It is included here only so that the contents of the original letter can be searchable.  (The PDF received from the City is in the form of an image, and so is not a searchable document.)

    What is below is not the letter sent by the letter-writer. It will contain typographical errors and other departures from the original.  The PDF displayed above is accurate.  The text below is not accurate.  It is printed here for indexing purposes, so that each word can be indexed and included in the search.

    Hello Commissioners
    I was hoping you will review the additional Survey responses from the Building Design and Roof Facade Survey.
    I pointed out to Director Loya that a number of survey responses, that were received before January 31, were left out of your
    agenda packet for Saturday’s meeting. I would appreciate if you would take them into consideration before Saturday’s workshop.
    Please note that they are listed as being received after January 31, that statement is not correct. The surveys were overlooked, not
    late.
    Thank you for your time.
    James Becker