Economic Development Committee comments on the Draft Gateway Plan – August 1, 2022

    0
    459

    Loading

    Editor’s Note:
    This appears to be the marked-up text of different policy chapters of the December 1, 2022 draft Gateway plan. There is no date or source on it — no title whatsoever. It does not seem to be a letter, yet it is included in the City’s letters on the SIRP website.

     
     
     

     

    Note:  What is shown below is a copy of the original letter, made for this website.  It is included here only so that the contents of the original letter can be searchable.  (The PDF received from the City is in the form of an image, and so is not a searchable document.)

    What is below is not the letter sent by the letter-writer. It will contain typographical errors and other departures from the original.  The PDF displayed above is accurate.  The text below is not accurate.  It is printed here for indexing purposes, so that each word can be indexed and included in the search.

    See the PDF document – no text version exists.